Yes. When the kit contents are still acceptable, and only the insert is outdated, rework can remove the obsolete insert, add the current version, and rebuild the kit to the current specification. That approach avoids scrapping an entire lot for one fixable issue.
The process starts by separating affected kits from conforming stock and confirming the SKU, lot, and kit version. Kits are opened or broken down as needed, and the current insert is installed according to approved work instructions. Count verification and label review confirm that each rebuilt kit matches the bill of materials before final pack-out inspection.
The manufacturer supplies the current insert version, bill of materials, packaging requirements, and inspection criteria, and approves release of the corrected units. Peoria Production Solutions handles kit correction with trained teams and documented exception reporting, keeping conforming and nonconforming materials separate throughout the project.
Learn More